FAR EAST TERMINAL
Delo Group
DeloPorts
Assets
Key Highlights
Contacts
Global Ports
Assets
Key Highlights
Contacts
TransContainer
Assets
Services
Key Highlights
Contacts
RUSCON
Assets
Services
Key Highlights
Contacts
Location
Back
FAR EAST TERMINAL
Berth 8
Length
408 m
Max draft
10.4 m
FAR EAST TERMINAL
Berth 7
Length
264 m
Max draft
10.4 m
FAR EAST TERMINAL
Berth 6
Length
312 m
Max draft
11.7 m
FAR EAST TERMINAL
Berth 5
Length
300 m
Max draft
11.7 m
FAR EAST TERMINAL
Container yard (straddle carrier technology)
Storage capacity
2 200 TEU
FAR EAST TERMINAL
Container yard operated with Rubbertyred Gantry Cranes (RTG)
Storage capacity
11 000 TEU
FAR EAST TERMINAL
Container yard operated with Rail-mounted Gantry Cranes (RMG)
Storage capacity
14 984 TEU
FAR EAST TERMINAL
CFS #1
Total area
7800 m2
Heated area
480 m2
Inspection slots
37*
*19 gates and 18 universal platforms
dedicated r/w line
9 wagons intake
FAR EAST TERMINAL
Handling equipment and machinery: repair and maintenance
FAR EAST TERMINAL
Railway front for berths 7, 8
R/w lanes
6
Effective r/w length
1974 m
Intake (wagons)
141
Rail-mounted gantry cranes (RMG)
2
FAR EAST TERMINAL
Railway front for berths 5, 6
R/w lanes
7
Effective r/w length
2492 m
Intake (wagons)
178
Rail-mounted Gantry Cranes (RMG)
5
FAR EAST TERMINAL
Administrative building
FAR EAST TERMINAL
Entrance security check-point
Drive lanes
2
Service
24/7
FAR EAST TERMINAL
Stationary X-ray facility
FAR EAST TERMINAL
Reefer container yard
Plugs
80
FAR EAST TERMINAL
Reefer container yard
Plugs
120
FAR EAST TERMINAL
Container yard
FAR EAST TERMINAL
Reefer container yard
Plugs
126
FAR EAST TERMINAL
CFS #2
FAR EAST TERMINAL
Entrance security check-point
FAR EAST TERMINAL
Inspection Area
FAR EAST TERMINAL
Future development area
Location on the map
Berth 6
CFS #1
Railway front for berths 5, 6
Handling equipment